We are pleased to present our latest multi-family building project with underground garage in Ząbki near Warsaw. The investment is located on Pileckiego Street between Powstańców and Herberta Streets.
The development is situated in a neighborhood adjacent to the forest and low-density housing, yet very close to a full urban infrastructure. Nearby are bus lines that provide quick access to Warsaw (M1 Marki shopping center, Trocka metro, Siekierkowska Trasa).
In the immediate vicinity, you will find: healthcare centers, kindergartens, primary schools, churches, grocery stores and more.
The new development was designed with the comfort of future residents in mind.
The building has 5 floors, including 4 above ground floors and 1 underground garage floor. The garage has 95 parking spaces and locker rooms. In the building there are 3 staircases equipped with elevators from the garage level.
The investment includes 82 residential units, ranging from 27 to 73 m². All apartments will have balconies, and for ground-floor apartments, green gardens - a safe place for play and relaxation without the need to leave home.
Available apartments:
• One-bedroom apartments with an area of 27 m² (4 apartments)
• Two-bedroom apartments with an area of 38 m² (36 apartments)
• Three-bedroom apartments with an area of 49 m² (36 apartments)
• Four-bedroom apartments with an area of 54 m² (6 apartments)
On the development site, there will be 17 above-ground parking spaces, which will provide a cheaper alternative for residents to park on the development site and 26 spaces on a paved surface.
The building will feature a simple shape in a beige and gray color scheme.
The development will be fenced, and the building will be adapted for CCTV installation.
Communication with Warsaw provides future residents with a convenient and easy access to the job market, and the short distance to numerous kindergartens, schools, stores and service points guarantees a comfortable life for the entire family.
Nature's proximity allows for a true relaxation after work. Numerous trails and forest tracks provide opportunities for walks and bike rides in the forest.
The "Pileckiego Estate" investment is currently under construction, which began in July 2023, and the planned completion date for construction works is July 2025.